Cycling on Rails
@cycling_on_rails@mastodon.social  路  activity timestamp 4 days ago

For report worms, new "Transport 2045" analysis by ETHZ just dropped, ranking motorway and railway projects in Switzerland for the next 20 years. For context it was ordered by the ministry of transport following the rejection of motorway projects last November.

Lot's to unpack so I'll just leave the links here for now, further thoughts to follow. Available in DE/FR/IT as you do 馃嚚馃嚟

DE: https://www.uvek.admin.ch/de/verkehr-45
FR: https://www.uvek.admin.ch/fr/transports-45
IT: https://www.uvek.admin.ch/it/trasporti-45

#transport #infrastructure

  • Copy link
  • Flag this post
  • Block
Cycling on Rails
@cycling_on_rails@mastodon.social replied  路  activity timestamp 4 days ago

Direct PDF links 馃摎馃摐馃搫
- DE https://www.uvek.admin.ch/dam/de/sd-web/otbleRCrlLBm/20251009%20ETH%20Z%C3%BCrich%20Verkehr45%20Gutachten%20DE.pdf
- FR https://www.uvek.admin.ch/dam/fr/sd-web/otbleRCrlLBm/20251009%20ETH%20Z%C3%BCrich%20Verkehr45%20Gutachten%20FR.pdf
- IT https://www.uvek.admin.ch/dam/it/sd-web/otbleRCrlLBm/20251009%20ETH%20Z%C3%BCrich%20Verkehr45%20Gutachten%20IT.pdf

  • Copy link
  • Flag this comment
  • Block
Oliver Blanthorn
@bovine3dom@masto.ai replied  路  activity timestamp 4 days ago

@cycling_on_rails 300 million francs to _improve_ passenger flow at Gen猫ve Cornavin?

Hasn't SNCF Gares & Connexions told them they could reduce their flows massively and reduce rail demand with just a few tens of millions for ticket barriers and some padlocks on some doors?

A table of priorities and costs for projects. Cornavin Tiefbahnhof (underground station) will cost 1.8bn CHF. Improving passenger flow at Cornavin (Fahrgastfluss) will cost 300mn CHF.

Both projects are the highest priority
A table of priorities and costs for projects. Cornavin Tiefbahnhof (underground station) will cost 1.8bn CHF. Improving passenger flow at Cornavin (Fahrgastfluss) will cost 300mn CHF. Both projects are the highest priority
A table of priorities and costs for projects. Cornavin Tiefbahnhof (underground station) will cost 1.8bn CHF. Improving passenger flow at Cornavin (Fahrgastfluss) will cost 300mn CHF. Both projects are the highest priority
  • Copy link
  • Flag this comment
  • Block
Log in

Open Science

We are a network of scientists, developers and organizations building the next generation of digital spaces for open science.

Open Science: About 路 Code of conduct 路 Privacy 路 Users 路 Instances
Bonfire open science 路 1.0.0-rc.3.14 no JS en
Manual federation enabled
  • Explore
  • About
  • Members
  • Code of Conduct
Home
Login